Oceanside Construction Co.
Newrybar, Newrybar, NSW

Newrybar

Newrybar, NSW · Whole-home renovation · August 2025

The brief

A complete transformation of an existing home, Newrybar is a project defined by craftsmanship, natural materials and meticulous detailing. Every element was carefully considered, from the rough-sawn hardwood pergolas and recycled bridge beams through to the handcrafted joinery, microcement bathrooms and custom arched shaving cabinets. Working closely with the owners, the home was reimagined into a series of calm, light-filled spaces where every finish feels intentional. It's a project that reflects our passion for thoughtful construction and the beauty of building with timber.

Location
Newrybar, NSW
Type
Whole-home renovation
Design
Design by Fold Architects
Completed
August 2025
Scope
Whole-home renovation, Handcrafted joinery, Microcement bathrooms, Rough-sawn hardwood pergolas, Finishes and tapware
Materials
Rough-sawn hardwood, Recycled bridge beams, Microcement, Natural stone, Hand-glazed tiles
Primary bedroom under recycled bridge beams, opening to the courtyard
Primary bedroom under recycled bridge beams, opening to the courtyard
The same room from the doorway, paper lantern hung off the ridge
The same room from the doorway, paper lantern hung off the ridge
Roof-truss joinery in rough-sawn hardwood
Roof-truss joinery in rough-sawn hardwood
Freestanding bath with zellige tile and linen curtain
Freestanding bath with zellige tile and linen curtain
Stone vessel basin with aged brass tapware
Stone vessel basin with aged brass tapware
Curved microcement wall to the powder room
Curved microcement wall to the powder room
Timber door with brass lever and mortice
Timber door with brass lever and mortice
Oak door leaf and brass hinge on the bench
Oak door leaf and brass hinge on the bench
Sam is a top-quality builder who clearly takes pride in his work. From the very beginning we always felt confident in both his team and the standard of work they delivered.

Mira Murray · Newrybar, NSW

Build timeline

  1. Initial conversation

    May 2023

  2. Site meeting and survey

    June 2023

  3. Documentation and approvals

    July 2023 – January 2024

  4. Construction

    February 2024 – July 2025

  5. Completion

    August 2025