8 Raftons Road

Bangalow, NSW · Designer renovation · March 2026

The brief

A carefully curated designer renovation focused on creating warmth, functionality and beautifully crafted living spaces. While modest in scale, the project centred on bespoke joinery and finely detailed finishes that give the home its unique character. A new fireplace became the focal point of the living area, featuring an arched hearth recessed flush with the floor and finished with carefully selected designer tiles and a wood heater. Throughout the home, custom plywood joinery was paired with recycled cheeseboard timber fronts, creating a balance between contemporary design and reclaimed materials. Built-in bedroom robes, hallway shelving and a custom window seat with leather upholstery and designer fabrics complete a renovation where every detail was thoughtfully considered and expertly crafted.

Location
Bangalow, NSW
Type
Designer renovation
Design
Interiors by the owners with Oceanside
Completed
March 2026
Scope
Bespoke joinery, Custom fireplace with arched hearth, Built-in robes and hallway shelving, Custom window seat and upholstery, Designer tiling
Materials
Custom plywood joinery, Recycled cheeseboard timber, Designer tiles, Leather upholstery, Designer fabrics
Black steel fireplace against handmade geometric tile
Black steel fireplace against handmade geometric tile
Timber-lined ceiling carried through to the living room
Timber-lined ceiling carried through to the living room
Joinery set flush into the wall line
Joinery set flush into the wall line
Kitchen bench in solid hardwood
Kitchen bench in solid hardwood
Light washing the hallway at the end of the day
Light washing the hallway at the end of the day
Tile setout resolved before a single sheet was cut
Tile setout resolved before a single sheet was cut
Detail where cabinetry meets stone
Detail where cabinetry meets stone
The room finished, furniture in
The room finished, furniture in

Build timeline

  1. Initial conversation

    February 2025

  2. Site meeting and survey

    March 2025

  3. Documentation and approvals

    April – June 2025

  4. Construction

    July 2025 – February 2026

  5. Completion

    March 2026